DZ HEZE

2024-08-02 17:20

DZ HEZE The ship was at Zhoushan COSCO Shipyard for annual inspection. The shipowner invited us to board the ship for equipment inspection. The project was as follows: the main engine high-pressure oil pump was dismantled and brought into the factory, the exterior was sanded and repainted, the plunger pair was dismantled for clearance data measurement, and unqualified ones were replaced. The same was done for other parts. The lifeboat diesel engine was dismantled and maintained in the factory. The installation and commissioning were successful and the ship was delivered.